BELVI has rich experience regarding the construction of new 220 kV power lines and the reconstruction of already existing and similar power lines, as well as regarding planned, current and periodic repairs, provision of necessary dimensions, displacements and reconstructions connected with newly built infrastructure sites.
Here are some of our projects
- Changing of a lightning protection rope of 220 kV Rila 1 and Rila 2 overhead line
- Reconstruction of 220 kV Zhiten-Struma overhead line in the area of Lyulin highway
- Reconstruction of 220 kV Pancharevo-Darvenitsa overhead line in the area of Sofia ring road
- Reconstruction of 220 kV Hemus-Stara Planina overhead line in the area of Trakiya LOT 3 highway
- Replacing the lighting protection conductor with OPGW of 220 kV overhead line Kumanitsa